2000kW Chiller Package

The Challenge

A pharmaceutical manufacturer faced an immediate production risk after their primary process chiller failed mid-cycle. The facility runs a continuous API (active pharmaceutical ingredient) synthesis process that requires stable coolant temperatures between 8°C and 12°C. Any deviation beyond ±1°C risks batch integrity and regulatory compliance under their GMP framework.

With continuous production in place, any prolonged downtime risked significant batch losses and costly disruption to supply commitments. 

Their in-house engineering team had already identified the fault — a compressor failure on their 185kW fixed installation — but lead times for a replacement compressor were running at 4 to 6 weeks. They needed cooling capacity back online within days, not weeks.

The Survey

We sent an engineer to the site within 24 hours of the initial call. The main constraints were immediately clear: the plant room had no external footprint for a large generator or a conventional hire unit; the facility operated on a closed glycol loop at 30% concentration; and all hired equipment needed to be compatible with their existing pipework connections (DN100 flanged).

The process also demanded low-noise operation — the site sat within 50 metres of laboratory spaces with active stability studies running, meaning acoustic limits applied under their site operating procedures.

Survey of 2000kW Chiller Package

The Solution

We specified a 2000kW chiller package from our hire fleet — a self-contained air-cooled unit with an integrated pump set and buffer vessel, configured for glycol-compatible operation. The unit was preconfigured off-site to the required flow conditions, reducing commissioning time. 

Given the DN100 flange requirement, we fabricated bespoke connecting hoses in advance. The unit was positioned in an adjacent service yard, with a temporary insulated pipework run of approximately 18 metres connecting into their existing circuit via pre-installed isolation valves.

From initial survey to full operation, the system was live within just 71 hours.

Solution of Survey of 2000kW Chiller Package

The Result

Full production was restored within four days following the original failure, ensuring the site remained within its critical operating window.

Key outcomes of the project included:

–  Full GMP-compliant production restored within 4 days with zero batch loss or quality deviation 

–  Coolant temperatures maintained at 10°C ±0.5°C

–  Continuous operation over a 7-week hire period

–  Seamless integration with existing process systems

The engineering manager also noted that the pre-configured setup and same-day delivery from survey to decision significantly reduced the documentation burden for their quality team, with the hire unit operating within the same parameters as the existing system.

Result of 2000kW Chiller Package

Need rapid-response cooling for critical pharmaceutical or process environments? Rapid Chillers delivers 2000kW chiller package systems for critical pharmaceutical and GMP environments within days — not weeks.

Related Projects

chilled

Portable Air - Conditioning

This project was a challenge, we had a good power supply but no opening windows to discharge the waste heat, we needed to get creative! if we were going to help. We achieved this by installing ducting that vented directly into the air extract, the fix is crude but allowed installation of 5 of our 7.3KW portable coolers that reduced the room temperature by an impressive 11 degrees.

Bakery Chiller Breakdown

Bakery Chiller Breakdown

Following a call from a local site engineering manager, to advise his chiller had tripped in the summer heat we rushed to help. On site in less than 30 minutes, our sales manager got our lead engineer on the phone who talked the site's services engineer through the chiller checklist and restart. No hire service was provided but the client, realising they were vunerable asked for a chiller contingency plan to be created, so the site is better prepared to cope if there isnt a fix in the future.

nhs-logo

NHS Hospital

The client called us after finding our website on the internet. They needed three chillers servicing, we don't offer this service but we do have a good network of air-conditioning and industrial refrigeration contractors that provide the required service. We referred the caller to a local service partner who has quoted and secured the service contract. Another example of how we're prepared to go the extra mile to aid you finding the right solution.